Nine O'clock coat of Urethane is down and drying.
It is put down with a lambskin applicator.
Tools set up and ready to go. Bucket of Urethane, roller tray, and plastic cup to add product to the tray.
South side of Office partially done.
30 minutes later all the floor is done and drying. Very exciting, this is a huge step forward on getting the room done so we can move in and work out of there.
No comments:
Post a Comment