Building piece meal like this means things not being done in the right order. Sometimes we need to slow down and make sure we are doing everything that needs to be done. The hallway will be finished before we do anything else. As we were getting ready to put the last of the ceiling panels up I asked Bill if there shouldn't be heat and air in the hallway and he got a look on his face that was really quite funny. He prides himself on doing things right the first time and usually he does. Wouldn't you know it in our things left over from building our last house 20 years ago we had the duct work we needed to put into the hall. Chuck, our HVAC will be pleased that he isn't having to crawl through the small ceiling space to run it. Whew, problem averted.
No comments:
Post a Comment