These last few days of snow and ice were the perfect time to get the building started. Bill picked up enough lumber to get do the storage/workroom walls. Not a lot of extra work space since we need to be inside to do everything. Temperatures in the teens are not conducive to cutting boards outside.
Here is the start of the wall between the storage/work room and the Trophy room. There are already beans and such in place from the previous owner and we are following those lines. No need to redo what is already done. We are just designing around the existing.
Bill needs to put short studs above the metal beam so when we add the sheet rock it will be a seamless wall.
Now to get the new framing nailer out and start putting studs in.
Finished wall, have to leave two studs out so we can get into the room until the garage is done and the entry door is put in. We do not want to have to squeeze between 16 inch center studs every time we need a tool.
This is the beginning of the hallway going from the Trophy room to the garage. There will be a big window looking out at our view and a door at the end going into the garage.Have to start thinking what kind of lighting I want in the hall because we are putting our art work from South Beach on this long wall. Do we want sconces or eyeball cans? There will also be a small table in the hall. It is a wide hallway. No reason to scrimp on space.