1st Step:
Take the ceiling down in the workshop. That's easy since it is a drop ceiling.
2nd step:
Climb the ladder and crawl on the top of the shelving. Have to get to the far wall over the hallway.
3rd Step:
Run the pipe, connect the sticks and put in the joints.. This took about 45 minutes in the intense heat. Not a fun job. If we were remodelers this job would have cost you a pretty penny for us to go up in that heat. Of course the vacuum people do not use normal PVC pipe they have special pipe so you have to go direct to them. That's okay, anything for my vacuum system.
Brynnlee was with us and entertained herself with grocery shopping and cooking us lunch. Good entertainment for a two year old. Love their imagination at that age.
No comments:
Post a Comment