Monday, September 29, 2014

Itchy stuff

We want/need to get the extra bedroom built. It will be the second bedroom for now and the third bedroom at the end of the project. The grandkids have to sleep on the couches when they spend the night which they think is exciting but we would prefer beds for them. Before we can build the bedroom we need to build the pantry. Or at least get it far enough along to move the freezer out to its permanent spot. Right now it is in the area the bedroom and hallway will be, so it's in the way of building out that area.  Bill framed the pantry and the other rooms, then ran the electrical almost two weeks ago. Then life got in the way and I am just now having the time to insulate the walls so we can sheetrock, texture and paint. We won't do the flooring yet. Need to be further along in the project to make final decisions on flooring.

The wonderful insulation with covering on both sides was out of stock so we had to get the regular kind. Never, ever, ever again. I will wait a couple of days for them to get the encased stuff in. After putting up the insulation I had to shower to get all the itchy fibers off my body. The encased stuff is so clean and non itchy. Now we can get started on finishing the walls and get the freezer into its spot.

I still need to insulate the hallway, coat closet and cleaning closet. I'll get that done tonight after work.



No comments:

Post a Comment