Roof may be going on and the framer didn't finish his job. He was suppose to put the fascia on around the eyebrow and the tower. So it's left up to us to do; so things will be ready for the roof.
Driving the scissor lift out of the West Wing. It is a tight fit and Bill gets to drive on his knees. He asked if I wanted to get it out and I looked at him like he was crazy, I am not going to be the one who drives it through a wall.
Wyatt bringing tools over with bike power.
This is the highest we have ever taken the scissor lift. It was extended as high as it would go. The driveway is sloped so we had to have one side up on wood. It was a little wobbly so being the safe people we are we tied it off to the tower. There was no way it could come down but it made us feel safer. It alarms if you are not level. On the sides we had to use the extension ladder to go up because we couldn't get level enough for it to be happy.
Working the controls.
I always fet to do a lot of standing around giving emotional support.
Bill likes to live on the edge
We needed the extra battery for the drill gun so Wyatt loaded it into a bucket for us to haul up.
Here we are on the highest part of the house. Didn't finish the fascia but it is on enough the roofers can do their job. That is h ot work at the end of the day working at a rock yard.;
No comments:
Post a Comment